FUL/000633/23
Meeting: 10/01/2024 - Planning Committee (Item 48)
As in report
Additional documents:
- Enc. 1 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, item 48 PDF 2 MB
- Enc. 2 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, item 48 PDF 2 MB
- Enc. 3 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, item 48 PDF 2 MB
- Webcast for FUL/000633/23 - A - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell
Decision:
That in accordance with the officer recommendation, planning permission be granted subject to the conditions set out in the report.